Concrete Slab Cost Calculator

The truck's delivery charge can hurt on a small pour. Add it separately. Your concrete price covers only part of the job, so the estimate below leaves room for paid labor and the work needed before the truck arrives.

Project estimate

Labor
Project costs ($ total)

Concrete material cost

A 20x20 slab at 4 inches contains about 4.94 cubic yards. Add 10% for waste and the order estimate becomes 5.43 cubic yards; a supplier may round that up to its next delivery increment.

For a worked example, assume a quoted mix price of $160 per cubic yard. The concrete line would be about $869.14 before supplier rounding. That price is an arithmetic example, and your local quote may be quite different.

Installed slab cost

Enter each extra charge once. If a contractor's preparation price already includes gravel, placing that same gravel bill in the base-material field would count it twice.

Keep the quote nearby. A handwritten allowance for hauling broken concrete can be easy to miss between the excavation line and a disposal fee, especially when two people have priced different parts of the job.

The concrete slab cost guide covers quote comparisons and costs by size. This tool uses the prices you supply; unfilled project-cost fields contribute zero to the total.

DIY labor

Switching to DIY removes the paid-labor line. Equipment rental stays. So does any excavation you're paying someone else to do, along with the concrete itself.

Your time has a cost even if no invoice arrives. Add an allowance under other costs when you want it included in the comparison.