An extra inch across a 20x20 pad adds about 1.23 cubic yards to the pour. Measure the depth. Enter your dimensions below, then adjust the waste allowance to see how much concrete you'll need to order.

Slab
Units
Concrete Volume1.36 yd³
Bags
62 × 80 lb
Weight
5,500 lb
Loads
1

How to use this calculator

  1. 1. Enter dimensions
    Fill in the required fields for this concrete form.
  2. 2. Click Calculate
    Review volume, bag counts, weight, and ready-mix loads.
  3. 3. Adjust if needed
    Open advanced options for waste, density, prices, and truck capacity.

Common examples

10×10 slab @ 4 in
1.23 cubic yards before any waste allowance.
20×20 slab @ 6 in
7.41 cubic yards. Confirm the specified thickness before ordering.

Estimating notes

  • Add 5–10% waste for spillage and uneven subgrade.
  • Use the thickness specified for your project. This calculation does not select a structural design.
  • Measure in multiple spots and use the largest dimensions to avoid coming up short.
  • Bag yields and density vary by product; verify values on your bag or supplier spec sheet.
  • Cost estimates exclude delivery fees, taxes, and minimum loads.

Calculate concrete for a slab

Multiply length by width in feet, then multiply by thickness in inches and divide by 324. That gives cubic yards. A 12x12 pad at 4 inches works out to 1.78 cubic yards before waste; with a 10% allowance, it becomes 1.96.

Measure inside the forms. And check several points across the prepared base, because a low patch near the back corner can swallow concrete without changing the dimensions you wrote down.

Concrete pad calculator measurements

A rectangular patio and a rectangular shed pad use the same volume formula. Their construction details can differ considerably, especially where a building needs a thickened edge or separate footing.

For an L-shaped pad, split the plan into rectangles that don't overlap and add their volumes. Calculate only the extra depth of a thickened edge if the slab calculation already includes the concrete above it.

Material quantities and bag counts

Bag yield varies. At a stated yield of 0.6 cubic feet per 80 lb bag, a 10x10 pad at 4 inches needs 56 bags before waste, or 62 with 10% added. Check the product label before paying for a pallet.

The 10x10 bag-count guide works through other thicknesses. For reinforcement quantities, the rebar calculator uses the spacing you enter from your design.

Budget for the whole pour