An extra inch across a 20x20 pad adds about 1.23 cubic yards to the pour. Measure the depth. Enter your dimensions below, then adjust the waste allowance to see how much concrete you'll need to order.
Calculate concrete for a slab
Multiply length by width in feet, then multiply by thickness in inches and divide by 324. That gives cubic yards. A 12x12 pad at 4 inches works out to 1.78 cubic yards before waste; with a 10% allowance, it becomes 1.96.
Measure inside the forms. And check several points across the prepared base, because a low patch near the back corner can swallow concrete without changing the dimensions you wrote down.
Concrete pad calculator measurements
A rectangular patio and a rectangular shed pad use the same volume formula. Their construction details can differ considerably, especially where a building needs a thickened edge or separate footing.
For an L-shaped pad, split the plan into rectangles that don't overlap and add their volumes. Calculate only the extra depth of a thickened edge if the slab calculation already includes the concrete above it.
Material quantities and bag counts
Bag yield varies. At a stated yield of 0.6 cubic feet per 80 lb bag, a 10x10 pad at 4 inches needs 56 bags before waste, or 62 with 10% added. Check the product label before paying for a pallet.
The 10x10 bag-count guide works through other thicknesses. For reinforcement quantities, the rebar calculator uses the spacing you enter from your design.
Budget for the whole pour
The price fields above estimate concrete material costs. Delivery and site preparation still need room in the budget, and paid finishing work can change the total considerably. Build an itemized estimate with the concrete slab cost calculator.